Freight RFP Checklist

By:
Transportation planner reviewing freight lane data and carrier requirements for a trucking RFP

What shippers should include when requesting transportation bids from freight carriers and managed transportation providers.

A freight request for proposal should give carriers enough information to understand the transportation program, price the work consistently, and identify which lanes or shipment types fit their equipment and network. A bid package that includes only origins, destinations, and annual volume can leave too many unanswered questions about equipment, loading conditions, accessorials, service expectations, seasonality, and special freight.

This freight RFP checklist is designed for manufacturers, retailers, distributors, construction companies, industrial shippers, and other businesses preparing a formal transportation bid. Buchanan Hauling & Rigging, Inc. can review opportunities involving dry van and flatbed transportation, expedited freight, specialized transportation, heavy haul, and managed logistics.

Freight RFP vs. One-Time Rate Quote

A transportation RFP is different from requesting a rate for one shipment. A one-time quote usually centers on a specific load with a known origin, destination, commodity, equipment requirement, and schedule. An RFP typically asks carriers to evaluate a larger transportation program that may involve recurring lanes, projected shipment volume, multiple facilities, service requirements, and an award period.

A freight RFP may be appropriate when a shipper is:

  • Rebidding recurring truckload lanes
  • Adding new carrier capacity
  • Opening or changing facilities
  • Reviewing several equipment types
  • Preparing for seasonal freight
  • Consolidating transportation providers
  • Evaluating asset-based and managed transportation options
  • Planning a large project with recurring or multi-load freight

For a single shipment or project load, Buchanan's Rate Quote page is the more direct starting point.

1. Define the Scope of the Transportation Bid

Begin the RFP by explaining what the shipper is asking carriers to price. A carrier should be able to tell whether the bid covers a small group of lanes, a regional network, nationwide truckload freight, project cargo, or a mixed transportation program.

State:

  • Business unit or facilities included
  • Geographic scope
  • Transportation modes or services requested
  • Expected award period
  • Expected implementation date
  • Whether incumbents and new carriers are both participating
  • Whether the shipper expects primary, backup, or overflow capacity
  • Whether carriers may bid selected lanes or must respond to the full package

If the RFP combines dry van, flatbed, specialized, expedited, and heavy haul freight, separate those requirements clearly. The data needed to price standard truckload freight is not always enough to evaluate oversized or project freight.

2. Provide Clean Lane Data

Lane data is the foundation of a transportation bid. Carriers need enough origin and destination detail to understand where freight actually enters and leaves the network.

For each lane, include:

  • Origin city, state, and ZIP code
  • Destination city, state, and ZIP code
  • Facility type when relevant
  • One-way or round-trip designation when applicable
  • Required equipment type
  • Historical or projected shipment count
  • Average shipment frequency
  • Seasonal or promotional volume changes

If several facilities share the same city, use ZIP codes or facility identifiers so carriers know which location the lane represents. When delivery conditions differ substantially between facilities, identify those differences in the bid package.

3. Include Historical and Projected Freight Volume

Annual volume alone may not show how freight behaves throughout the year. A lane with 100 annual loads could average two loads per week or move most of its volume during one seasonal period. Those patterns can affect carrier capacity planning.

When possible, provide:

  • Annual shipment count
  • Monthly or weekly shipment history
  • Average loads per week
  • Peak-season volume
  • Known promotions, shutdowns, or production peaks
  • Expected growth or contraction
  • New lanes with no historical data

Clearly distinguish historical shipments from forecasts. If the RFP includes projected business, label the volume as an estimate rather than presenting it as guaranteed freight.

4. Describe the Freight

Carriers need to know more than the lane and volume. Freight characteristics can affect equipment selection, loading, capacity, securement, permits, and operating requirements.

Include the information that applies to the freight:

  • Commodity or product category
  • Typical shipment weight
  • Maximum expected weight
  • Typical dimensions
  • Pallet, crate, bundle, or piece counts
  • Stackability when relevant
  • Loading orientation
  • Weather-protection requirements
  • Special handling requirements
  • Whether shipments may be oversized or overweight

For specialized or heavy haul freight, provide shipment-specific dimensions and weights whenever possible rather than relying only on averages.

5. State the Required Equipment

A carrier cannot evaluate a lane accurately without knowing the expected trailer type. If the shipper is open to more than one equipment configuration, say so and explain the freight requirements that drive the decision.

Equipment may include:

  • Dry van
  • Flatbed
  • Step deck
  • Lowboy
  • RGN
  • Extended or stretch equipment
  • Multi-axle heavy haul configurations
  • Expedited equipment
  • Other specialized trailers

If certain lanes occasionally require different equipment, identify that variation instead of combining everything into one generic lane description.

6. Document Pickup and Delivery Requirements

Facility conditions can affect the amount of time a truck and driver are committed to a shipment. The RFP should describe how freight is loaded and received, especially when the process differs by facility.

Include:

  • Shipping and receiving hours
  • Appointment requirements
  • First-come, first-served locations
  • Typical loading time
  • Typical unloading time
  • Driver check-in procedures
  • Dock, forklift, crane, or open-deck loading requirements
  • Jobsite or plant-access restrictions
  • Weekend or after-hours requirements
  • Known detention patterns

For construction sites, plants, or other locations with nonstandard access, provide current instructions rather than expecting carriers to identify site conditions after an award.

7. Identify Accessorial Charges and Exceptions

Freight bids are easier to compare when the RFP defines how common exceptions should be priced. Otherwise, one carrier may include a cost in the linehaul rate while another lists it separately.

Ask bidders to state pricing or policies for applicable items such as:

  • Detention
  • Layover
  • Truck ordered not used
  • Stop-off charges
  • Driver assist when applicable
  • After-hours service
  • Storage or staging when offered
  • Escort or permit charges for oversized freight
  • Special equipment charges
  • Other recurring accessorials in the shipper's network

The RFP should use the shipper's actual operating conditions rather than copying a generic accessorial list that does not apply to the freight.

8. Define the Fuel-Surcharge Method

Carriers should know whether the shipper expects a specific fuel-surcharge structure or wants bidders to propose one. Whatever method is used, it should be stated clearly enough that bids can be compared using the same assumptions.

Define:

  • Whether linehaul pricing includes or excludes fuel
  • The fuel index or benchmark if specified by the shipper
  • The base fuel price if applicable
  • The adjustment schedule
  • How fuel applies to specialized or project freight if different

Do not compare one carrier's all-in rate directly with another carrier's linehaul-only rate unless the fuel and accessorial assumptions are normalized first.

9. State the Service Expectations

A transportation RFP should explain what performance matters to the shipper. Avoid listing performance requirements that the business does not actually track or intend to use.

Possible service expectations include:

  • Pickup performance
  • Delivery performance
  • Tender response expectations
  • Shipment-status communication
  • Proof-of-delivery requirements
  • Exception communication
  • Appointment compliance
  • Claims reporting procedures
  • Reporting cadence

Define the measurement method when a specific KPI is important. For example, if on-time delivery is measured against appointment time rather than delivery date, state that in the RFP.

Freight lane spreadsheet being used to prepare a transportation carrier bid

10. Explain Tendering and Communication Requirements

Carriers should understand how freight will be tendered and how the shipper expects transportation communication to work after implementation.

Identify:

  • Tender method
  • Expected response time
  • Primary transportation contacts
  • After-hours contact requirements
  • Tracking or status-update expectations
  • EDI, API, portal, email, or other communication requirements when applicable
  • Escalation procedures for service exceptions

If technology integration is mandatory, identify that requirement before the bid rather than after awards are made.

11. Include Safety, Authority, and Insurance Requirements

Shippers should define the carrier qualification requirements that apply to their transportation program. Requirements may involve operating authority, insurance, safety policies, customer-specific rules, or documentation.

The Federal Motor Carrier Safety Administration provides public resources for checking motor carrier registration, operating authority, insurance, and available safety information. FMCSA also cautions users not to treat Safety Measurement System indicators as a federal safety rating or a stand-alone conclusion about a carrier's overall safety condition.

Depending on the RFP, qualification requirements may include:

  • Active operating authority
  • Required insurance documentation
  • Applicable safety-rating requirements
  • Customer-specific safety procedures
  • Driver or facility requirements
  • Equipment standards
  • Specialized permits or qualifications when applicable

Have the shipper's legal, risk, safety, or procurement teams define the requirements that apply to the program rather than using a generic checklist for every carrier.

12. Separate Standard Freight From Specialized and Heavy Haul

A standard truckload lane bid is usually not enough to price heavy haul freight accurately. Oversized and overweight moves can depend on exact dimensions, weight, axle configuration, permits, route, escorts, loading method, and site access.

If the RFP includes heavy haul or project cargo, provide:

  • Representative load specifications
  • Expected project locations
  • Known equipment requirements
  • Estimated load counts
  • Loading and unloading methods
  • Permit and escort assumptions
  • Site-access information
  • Expected project timing

For individual oversized loads, Buchanan's Heavy Haul Shipping Checklist provides a more detailed list of shipment information needed before transportation planning.

13. Use a Standard Pricing Template

Give every bidder the same pricing format. This reduces the amount of interpretation required when responses are returned.

A lane-pricing sheet can include:

  • Lane ID
  • Origin
  • Destination
  • Equipment
  • Estimated annual volume
  • Linehaul rate
  • Fuel treatment
  • Minimum charge when applicable
  • Accessorial references
  • Capacity commitment or notes

For mixed transportation programs, separate standard truckload lanes from expedited, specialized, heavy haul, or project freight so the pricing structure matches the service being requested.

14. Tell Carriers How Awards Will Be Structured

Carriers do not need to know every internal procurement detail, but they should understand the basic award structure.

Clarify:

  • Expected contract or rate period
  • Primary and secondary carrier structure when applicable
  • Whether lane awards are exclusive or shared
  • Expected start date
  • Whether incumbent pricing will remain active during transition
  • How award notifications will be communicated

A carrier may evaluate capacity differently for a primary award than for occasional overflow freight. Identifying the expected role helps the bidder respond appropriately.

15. Allow Carriers to Note Exceptions and Assumptions

An RFP should not force every bidder into a yes-or-no response when a lane needs clarification. Provide a field for carriers to identify assumptions, equipment limitations, seasonal constraints, or lane-specific conditions.

Examples include:

  • Capacity available only on certain days
  • A lane that requires a different trailer
  • Appointment limitations
  • Volume that exceeds the carrier's preferred commitment
  • Specialized freight requiring load-specific review

Those notes can be useful during bid analysis because they show where a rate depends on an assumption that may not match actual operations.

16. Establish a Clear RFP Timeline

Give carriers enough time to review the data and ask questions, particularly when the bid contains many lanes, multiple equipment types, or specialized freight.

Publish:

  • RFP release date
  • Question deadline
  • Date answers or amendments will be distributed
  • Bid due date
  • Expected award date
  • Implementation date

When one bidder receives a clarification that changes the meaning of the RFP, consider providing the same clarification to all participating carriers so they are pricing from consistent information.

17. Plan the Implementation Before the Award

The lowest submitted rate does not complete the transportation project. Before awards are finalized, determine what information carriers will need to begin moving freight.

Implementation can involve:

  • Customer and carrier contacts
  • Facility instructions
  • Lane awards
  • Rate files
  • Fuel and accessorial schedules
  • Tendering procedures
  • Technology setup
  • Tracking requirements
  • Billing instructions
  • Go-live dates

For a large network change, consider whether awards should be implemented at one time or phased by facility, region, or transportation service.

Asset-Based Capacity and Managed Logistics in an RFP

Some RFPs are designed only for asset-based carriers. Others ask providers to support freight through a combination of owned assets and qualified carrier capacity. The RFP should state which model the shipper is willing to consider.

Buchanan Hauling & Rigging is an asset-based motor carrier supporting dry van, flatbed, expedited, specialized, and heavy haul freight. Buchanan also provides 3PL Managed Logistics Services for customers that need additional capacity, multiple shipping locations, recurring freight coordination, changing equipment requirements, or transportation management across a broader carrier network.

When responding to an RFP, Buchanan can evaluate which lanes fit its asset-based network and whether other parts of the transportation program may fit its managed logistics capabilities.

Shipping team reviewing equipment, freight volume, and service requirements for a carrier RFP

A Freight RFP Should Make Bids Easier to Compare

The purpose of a strong bid package is not to make the document longer. It is to reduce ambiguity. Two carriers can return very different prices when they make different assumptions about equipment, volume, detention, appointments, fuel, accessorials, or service requirements.

Before releasing an RFP, ask whether a carrier unfamiliar with the business can understand:

  • What freight is moving
  • Where it is moving
  • How often it moves
  • What equipment is required
  • How the facilities operate
  • What exceptions occur regularly
  • What service level is expected
  • How pricing should be submitted
  • When the business is expected to start

If those answers are clear, the shipper has a stronger starting point for comparing transportation proposals.

What to Send Buchanan for a Transportation RFP

Businesses interested in including Buchanan in a freight bid can provide the RFP package, lane file, equipment requirements, shipment history, service expectations, and bid instructions to Buchanan's transportation team.

Useful information includes:

  • Lane spreadsheet
  • Historical and projected volume
  • Commodity information
  • Equipment requirements
  • Facility hours and appointment rules
  • Accessorial requirements
  • Fuel-surcharge structure
  • Service expectations
  • Pricing template
  • Bid timeline
  • Expected award period
  • Implementation date
  • Specialized or project-freight requirements

If your business is not running a formal RFP and simply needs a price for an upcoming shipment, use Buchanan's Rate Quote page.